    Gebouwfiche VDAB 079 Vilvoorde
    building-sustainability

    Advice on energy renovation in the framework of Sure 2050 for VDAB

    VDAB was looking for assistance in the framework of the energy optimization of their patrimony, in order to achieve the climate objectives 2045 in the long term and 2030 in the medium term.

    View the case Arrow right
    IMEC
    business-transformation

    BIM to Maintenance approach at IMEC

    From the construction of IMEC 6, a "burning platform" arises with questions on BIM, classification, standards, plan management and the (to be established) relationship between BIM and Planon.

    View the case Arrow right
    Zeepreventorium
    building-sustainability

    Audit Zeepreventorium De Haan

    At the Zeepreventorium in De Haan, we carried out a building audit of 11 buildings.

    View the case Arrow right
    Opgroeien be
    building-sustainability

    Feasibility study CO2 neutral De Zande Wingene De Zande Wingene

    The Agency for Opgroeien looked for assistance from Freestone in the framework of a feasibility study for the patrimony in Wingene, in order to achieve the climate objectives 2045.

    View the case Arrow right
    Iris
    facility

    Benchmark office building Iris (Evere)

    Iris asks us to benchmark the main costs and KPIs within the framework of the current staffing of her head office.

    View the case Arrow right
    Sibelga
    bpo-en - facility

    Coordination internal moves Sibelga

    Sibelga is the distribution system operator for electricity and natural gas in the Brussels-Capital Region. They called on Freestone for the coordination of all internal relocation movements, but also for space and asset management in a broader sense.

    View the case Arrow right
    Integrale
    building-sustainability

    Capex analysis Integrale

    Our mission was to determine the capex budgets for each building.

    View the case Arrow right
    VDAB
    real-estate-

    Housing study VDAB

    In assignment of Sureal, Freestone is appointed to work out a high level cost estimate for different sites and buildings of the VDAB.

    View the case Arrow right
    Leasinvest
    building-sustainability

    Technical multi-year maintenance planning (CAPEX) Leasinvest

    Leasinvest Real Invest asked us to gain insight into the CAPEX expenditures, via a long-term technical planning.

    View the case Arrow right
    Bpost
    business-transformation

    Development of Proptech strategy for Bpost

    Our assignment at Bpost started with evaluating whether their current IWMS (Archibus) meets the requirements of a backbone and whether it can/should be retained.

    In a second phase, Freestone mapped out all functional requirements of all departments within Service Operations, and then prioritized them, in order to arrive at a concrete implementation plan for 2022.

    View the case Arrow right
    RIZIV
    facility

    Masterplan RIZIV and shaping the new facilities organisation of RIZIV, FOD Volksgezondheid and FAGG

    Freestone has continuously provided RIZIV and by extension the FOD Public Health and FAGG with advice since 2015 with regard to their housing strategy. The assignment can initially be reduced to three stages:

    • Masterplan RIZIV
    • Vision creation modern FM organisation + development of roadmap
    • Implementation
    View the case Arrow right
    VUB
    building-sustainability

    Audit gebouwen VUB

    Freestone werd aangesteld voor een doorlichting/audit van de gebouwen van de VUB voor de site Etterbeek en Jette.

    View the case Arrow right
    Brandweerzone Kempen Grobbendonk
    building-sustainability

    Quickscans, conditiemetingen en meerjarenonderhoudsplanning voor Brandweerzone Kempen

    Na het afsluiten van een erfpachtovereenkomst van 50 jaar voor 6 kazernes, wou de Brandweer "weten waar ze voorstaan". Per kazerne werd eerst een quickscan uitgevoerd van de gebouwen en de terreinen.

    View the case Arrow right
    Provincie Limburg
    building-sustainability

    Provincie Limburg: Architectural, technical condition assessment and energy audit

    De conditiebepaling gebeurt op basis van de NEN 2767 en er wordt hierbij een onderscheid gemaakt tussen een conditiebepaling van de bouwkundige delen (daken, ramen, …) en een conditiebepaling van de installatiedelen van een gebouw of een gebouwsite.

    View the case Arrow right
    Gemeente Putte
    building-sustainability

    Conditiemeting Gemeentehuis Putte, bibliotheek en wijkkantoor van de politie

    De opdracht bestond uit de conditiemeting van het gemeentehuis voor bouw- en installatiedelen, het opstellen van onderhoudsbehoeften en de meerjarenonderhoudsbegroting.

    View the case Arrow right
    Logo CM
    facility

    Uitrol ééngemaakte FM organisatie bij CM

    View the case Arrow right
    Hospital1
    building-sustainability

    Inventory technical assets, condition measurement and energy quickscan for ZNA

    In 2019, Ziekenhuis Netwerk Antwerpen wanted to get an overview of the maintenance costs for 9 of their hospitals in Antwerp for the coming years and chose Freestone's expertise for this extensive assignment.

    View the case Arrow right
    Sodexo IMG 6877
    building-sustainability

    Inventaris en conditiemeting van de keukenruimtes in UZA

    Sodexo neemt een aantal horecaruimtes en uitrusting van UZA in concessie, en wil bij aanvang van het contract een goed beeld krijgen van de technische en bouwkundige toestand van de gebouwen, ruimten en de aanwezige keukenuitrusting.

    View the case Arrow right
    Voorkeursscenarios Meso Kuurne
    real-estate-

    Accommodation plan for the municipality of Kuurne

    An accommodation plan was implemented for the municipality of Kuurne with the aim of optimising the use and occupancy of the patrimony.

    View the case Arrow right
    Logo UZ Leuven en Hospital Logistics
    building-sustainability

    Conditiemeting, meerjarenonderhoudsplanning en audit brandveiligheid bij UZ Leuven (Hospital Logistics)

    Het gebouw (loodsen en inpandige kantoren, incl. cleanroom) van Hospital Logistics werd overgedragen aan UZ Leuven. UZ Leuven wou als nieuwe eigenaar aan de hand van een conditiemeting en een meerjarenonderhoudsplan inzicht krijgen in de staat van het gebouw en in de toekomstige kosten die nodig zijn om het gebouw te onderhouden.

    View the case Arrow right
    Gemeente Schilde
    building-sustainability

    Conditiemeting Gemeente Schilde

    De gemeente Schilde wil inzicht krijgen in de huidige bouwkundige en technische staat van het patrimonium en zicht op toekomstige investeringen nodig om hun gebouwen te onderhouden en operationeel te houden.

    View the case Arrow right
    Randstad
    facility

    View the case Arrow right
    Logo BAC
    facility

    Compliance audit Technical Maintenance (doorlichting Maximo) voor Brussels Airport Company

    • Compliancy audit Technical Maintenance (Doorlichting Maximo)
    View the case Arrow right
    Defensie
    building-sustainability

    Bouwkundige audit voor Defensie

    Defensie gunt aan Serco het contract voor de exploitatie van hun kazernes te Meerdaalwoud en te Heverlee, dat ingaat in september 2018. Voordat Serco het beheer en onderhoud ervan aanvat, wensen ze zicht te krijgen op de stand van zaken m.b.t. de staat van gebouwen, technieken, terreinaanleg en omheining. Daarom maakt Freestone een conditiemeting op, inclusief meerjarenonderhoudsplan voor 68 gebouwen en een totale vloeroppervlakte van 105.000 m².

    View the case Arrow right
    Kuehne Nagel
    building-sustainability

    Conditiemeting en plaatsbeschrijving voor Kuehne + Nagel

    View the case Arrow right
    Leuven
    building-sustainability

    Bouwtechnische audit Museum M (Stad Leuven)

    View the case Arrow right
    Aleris
    real-estate-

    Masterplan Aleris

    Management of Aleris, world leader in the production and sale of aluminum products, asked Freestone to assist them in the preparation of a master plan and to guide them in the step-by-step implementation thereof.

    View the case Arrow right
    Partena
    facility

    Uitrol unieke organisatie en opmaak lastenboeken voor Partena

    Uitrol unieke organisatie en opmaak lastenboeken voor Partena

    View the case Arrow right
    Quickscanalma
    facility

    Quick scan facility organisation and strategy maintenance

    AZ Alma recently moved from two branches to one new branch. As part of this move, the facilities department, more specifically the technical department, wants to perform a quick scan of their organization and building maintenance strategy.

    This move is an opportunity to evaluate and improve the functioning of the technical department.

    View the case Arrow right
    Turnhout
    building-sustainability

    Condition measurement and long-term maintenance planning for the Turnhout OCMW patrimony

    OCMW Turnhout wanted to carry out a study to draw up a multi-year maintenance plan and investment plan for their patrimony.

    View the case Arrow right
    facility

    FM proces & organisatie analyse + FMIS tool

    View the case Arrow right
    Geel
    building-sustainability

    Condition assessment and multi-annual maintenance planning for the City of Geel (NEN 2767)

    The Patrimony department of City Geel wanted to gain insight into the condition of its buildings at Werft 20 in Geel and asked Freestone Advisory for a condition measurement according to NEN 2767.

    View the case Arrow right
    Willebroek
    real-estate-

    Full accommodation study for the Municipality and PCSW of Willebroek

    The Municipality of Willebroek owns a great deal of infrastructure for sport and culture, as do many others. This includes things like football fields and club canteens, sports halls, meeting centres, cultural centres, etc. The majority of these premises were in need of extensive renovation, but the municipality was facing an investment backlog. There was also a lack of a concrete vision owing to a long-standing ad hoc approach and the municipality was struggling with management issues.

    View the case Arrow right
    Lodge.co
    facility

    Freestone supports Engie in developing the LODGE.co co-working space

    Freestone provided support for Engie in developing the business plan for LODGE.co. This consisted of an analysis of the market supply of ‘flexible spaces’ and the development of a business model with consideration for marketing, cost structure, infrastructure and an invoicing model.

    View the case Arrow right
    Fsma
    building-sustainability

    Condition status assessment and multi-annual maintenance planning for FSMA

    With a view to drawing up a multi-annual maintenance plan for FSMA's buildings, a condition assessment was carried out on its installations in the centre of Brussels. This condition assessment was conducted in accordance with the NEN2767 standard.

    View the case Arrow right
    Poofbis
    real-estate-

    Project POOF (Proud Owner of Facilities)

    A large pharmaceutical company in Belgium recently presented a new, powerful vision with a clear future project. The company wants to create a ‘nice place to work’ and offer its staff the workplace of the future. Besides the workspaces, this project aims to provide a modern layout for the cafeteria, the lobby, the main reception and the meeting rooms, among other areas.

    View the case Arrow right
    De Lijn
    building-sustainability

    Condition assessment and multi-annual maintenance planning for De Lijn

    The public transport company De Lijn owns an extensive network of sites and buildings. De Lijn's atypical infrastructure made for an additional challenge. Consider roofing stands for bus maintenance, cash machines and even grease pits.

    View the case Arrow right
    Agristo
    building-sustainability

    Drawing up Programme of Requirements for a new build

    Agristo was founded in the early 80s as the evolution of a soil-bound agriculture firm. It took only a short time to grow into a large-scale production unit for all manner of potato products, including fries.

    View the case Arrow right
    Delahize
    building-sustainability

    Inventorisation and condition assessment for Delhaize

    Delhaize Belgium hired Freestone to take stock of the technical installations of a dozen Delhaize department stores and to perform condition measurements. Both actions form the indispensable basis for the tender that Delhaize wants to launch for installation technical maintenance.

    View the case Arrow right
    Img 6952
    building-sustainability

    Spectacular condition assessments at Proximus Towers

    Connectimmo, Proximus' real estate subsidiary, approached Freestone to carry out condition assessments of the Proximus Towers in Brussels. The two office towers, each with 28 floors, date from 1988 and are no less than 335 feet tall. Furthermore, one of the towers has a 105-foot antenna, bringing its total height to 440 feet. The towers are connected to one another by walkways on the 25th and 26th floors.

    View the case Arrow right
    Leuven
    real-estate-

    Drawing up real estate strategy for the City & PCSW of Leuven

    At first, it was felt that the further strategy for the portfolio should be designed based on the results of the condition assessments and multi-annual maintenance planning. Freestone indicated that the technical state is only one of the many decision-making criteria for determining a real estate strategy.

    View the case Arrow right
    Antww
    real-estate-

    Drawing up strategic vision paper and macro scan of all buildings for the City of Antwerp

    Freestone was commissioned to draw up a macro scan of the entire portfolio. The intention was on the one hand to look to the future needs in real estate and accommodation based on the various policy plans, while on the other to look out for use cases and synergies across different business units in terms of accommodation and buildings.

    View the case Arrow right
    Antwerpenn
    real-estate-

    Drawing up strategic plan for technical buildings in the City of Antwerp

    Freestone was commissioned to draw up an accommodation plan for the city's technical buildings. This involved a framework contract with sub-assignments. In total, 105 buildings used by a range of business units were involved. This had led to a great deal of ‘overlap’ in the past, which meant the various sites were no longer being optimally used.

    View the case Arrow right
    Pza
    real-estate-

    Requirements analysis and study on functional optimisation of buildings and accommodation policy for Antwerp Local Police

    Freestone's assignment comprised an analysis of the existing buildings (analysis of the location, spatial-technical performance, operating costs, investment needs, rental and market value, benchmarking of the use of space and of the costs, evaluation matrix).

    View the case Arrow right
    Alma
    project-sourcing-en

    Technical support Biotechnical team

    General Hospital Alma, a regional hospital in Eeklo, was looking for a temporary employee who could be part of the biotechnical team to ensure the daily operation in relation to maintenance and inspections of medical devices.

    View the case Arrow right
    FSMA
    project-sourcing-en

    Facility Management Assistant at FSMA

    The FSMA, the body that supervises the Belgian financial sector in addition to the National Bank of Belgium (NBB), was looking for a junior Facility Management Assistant for their Brussels office. The question was to strengthen the existing team with a junior profile, trained as Bachelor Facility Management.

    View the case Arrow right
    Liantis
    project-sourcing-en

    Building Coordinator Liantis

    With two new construction projects in mind, Liantis was looking for a construction coordinator responsible for the follow-up of the various contractors and a correct budget follow-up. In addition, the building coordinator should also provide regular feedback to Liantis management.

    View the case Arrow right
    Connectimmo7
    project-sourcing-en

    Move Coordinator Connectimmo

    Connectimmo, the real estate company of the Proximus Group, appealed to Freestone People to find a suitable Consultant Program Manager to complete 11,000 relocations, renovations and changes.

    View the case Arrow right
    Bankk
    recruitment

    Facility Coördinator for a large bank

    Freestone People found a suitable Facility Coordinator for a large bank in Belgium in the context of recruitment, search & selection.

    View the case Arrow right
    Randstad
    project-sourcing-en

    Move coordinator Randstad Group

    Freestone People found a move coordinator for Randstad Group to coordinate and manage relocation projects. The move coordinator was engaged within the Building department of the Facility Department. This team manages all the buildings of the Randstad Group (Randstad, Tempo Team, Risesmart) in Belgium.

    View the case Arrow right
    FSMA-logo
    project-sourcing-en

    Structural Engineer for FSMA

    SMA, the Belgian Financial Services and Markets Authority, appealed to Freestone People in search of a structural engineer for an assignment of at least one year.

    View the case Arrow right
    Ank
    recruitment

    Bank and group insurance group looking for temporary Project Manager

    A bank and insurance group needed a temporary Project Manager from August 2018 to December 2020 for furnishing works of the head office. Thanks to Freestone they found the suitable candidate.

    View the case Arrow right
    Daikinn
    project-sourcing-en

    Coordinator renovation and relocation Daikin

    Daikin, a Japanese multinational specializing in air conditioning and cooling systems, needed a relocation coordinator for an internal relocation on the Ostend site. It soon became clear that the scope was much broader. The relocation coordinator also had to coordinate the planned renovation projects.

    View the case Arrow right
    Veritas-people
    bpo-en

    Facility Assistant Veritas

    In 2018, the Belgian retail chain Veritas has over 130 stores. Spread over the whole of Belgium, the facilities can call on the facility department at the head office in Kontich for their facility support. To strengthen the facility team, Freestone was asked to send a Facility Assistant.

    View the case Arrow right
    1500 1000 Post X Visibiliteit Billboard
    recruitment

    Projectleader Technics - IRET

    Project developer IRET Development was urgently looking for a Techniques Project Leader. Their search was speeded up when they engaged Freestone. The ideal candidate was screened and presented in less than a week!

    View the case Arrow right
    Go-onderwijs-met-logo
    project-sourcing-en

    Project manager construction 'GO! education of the Flemish Community'

    "GO! education of the Flemish Community ', in short the' GO! ', has an extensive patrimony of which a large part is due for renovation. Recently, the search was started for quality reinforcement of the program management team within the infrastructure department.

    View the case Arrow right
    Sciensano-met-logo
    recruitment

    Facility Coördinator - Sciensano

    Sciensano, the scientific reference in the field of public health, had been looking for a Facility Coordinator for some time. As soon as they turned to Freestone, a suitable candidate was introduced within the week!

    View the case Arrow right
    Servauto

    Stay-or-leave and rental negotiation Servauto

    Servauto, a subsidiary of TOTAL, which manages the service stations in Belgium, had an expiring lease for the offices at Fountain Plaza in Zaventem. A stay-or-leave analysis was necessary to make a forward-looking decision with regard to their accommodation.

    View the case Arrow right
    0_Mechelen_Campus_Toren

    Screening of buildings and site selection due to joint venture Janssens Field Services and Telenet

    Janssens Field Services, part of the French Solutions 30 - the largest European installer of telecom and 'smart home' infrastructure for companies and homes - recently started a joint venture with Telenet. Around 300 employees were transferred to the new company T-unit.

    View the case Arrow right
    Loyens

    Stay-or-leave business case, site selection and lease negotiations for Loyens & Loeff

    Loyens & Loeff, a leading international full-service legal and tax company, has been based in Sint-Lambrechts-Woluwe since 2001 where a building of 7,400 m² was rented. The lease contract ends in 2020, but a break option in the contract offered the opportunity to see whether the current building still met the company's future business needs.

    View the case Arrow right
    3DSS

    Site selection and lease negotiation for 3D Systems

    Independent real estate advisor Freestone assisted 3D Systems in 2017 with the lease of 1000 m² warehouse and 300 m² offices in the Heverlee complex, Ambachtenlaan 21. At the end of 2018, another 210 m² of offices and 375 m² of warehousing were added to the assignment.

    View the case Arrow right
    Kuhne Nagel

    Stay-or-leave, site selection and lease negotiation for Kuehne+Nagel

    Logistics service provider Kuehne+Nagel had been in an outdated building on the Frankrijklei in the center of Antwerp for years. In order to remain attractive on the labor market, a move was necessary. An approaching end date of the lease was the trigger for them to have Freestone carry out a stay-or-leave analysis.

    View the case Arrow right
    Greensquare Ws06 S1

    Stay-or-leave business case Boston Scientific

    As an independent real estate consultant, Freestone was hired by Boston Scientific. Boston Scientific, located in Green Square in Diegem where it rents 3,330 m², was confronted with a surplus of m² and an approaching break option. Annual indexations since the start of the contract had systematically increased the rent.

    View the case Arrow right
    Conference

    Stay-or-leave study for The Conference Board

    The Conference Board had a lease in their offices in Watermael-Bosvoorde that expires in 2021. A stay-or-leave analysis was necessary to make a forward-looking decision regarding their accommodation. It was considered to move more towards the city center, near a main train station. Stay-or-leave was not excluded, possibly on a somewhat smaller surface.

    View the case Arrow right
    044 A2Pix

    Commercial lease management for Adecco

    Temporary employment agency Adecco, based in Groot-Bijgaarden, has more than 130 local interim offices in Belgium. The company found an independent expert in Freestone for the commercial management of their extensive portfolio of rental contracts.

    View the case Arrow right
    Agilitas

    Optimisation and renegotiation of commercial lease contracts for Agilitas Group (Employment Agencies)

    75 locations were benchmarked in the initial phase and, based on the rental price currently paid and the timing in the agreement, a scope was formulated, consisting of 2 waves with 24 contracts in total. All the locations concerned were then approached from a spatial, technical and contractual angle.

    View the case Arrow right
    Pfizer
    project-sourcing-en - facility

    Maintenance Management

    Maintenance Management at Pfizer in Puurs

    View the case Arrow right
    Natuurinvest 3
    facility

    View the case Arrow right
    Brussels-Airport-Company
    facility

    Brussels Airport: Marktstudie en lastenboek conciërgerie

    Brussels Airport Company heeft in samenwerking met Freestone een marktstudie uitgevoerd naar het aanbod en het potentieel van de conciërgediensten. Het aanbod, vandaag beschikbaar op de markt, werd afgetoetst aan de wensen van Brussels Airport Company met grote diversiteit aan aangeboden diensten.

    View the case Arrow right
    De ploter
    real-estate-

    Screening CC De Ploter in Ternat

    As part of their patrimony management, the municipality of Ternat wanted a review of the entire building block of the Cultural Center De Ploter. This study allowed the municipality to make an informed decision about the future of the various buildings and functions.

    View the case Arrow right
    Natuurinvest veld
    facility

    Business plan for Natuurinvest

    Natuurinvest, together with 12 partners, joined the Interreg project GrasGoed in 2016. Freestone supported them by working out a financial feasibility study and a business plan for an ecological and sustainable insulation material idea.

    View the case Arrow right
    P1170501
    building-sustainability

    Condition assessment and multi-annual maintenance planning for Acerta

    Acerta has been using Freestone's condition assessment services since 2013, which serve as the basis for its multi-annual maintenance planning.

    View the case Arrow right
    Brussels Airport
    building-sustainability

    Inventorisation of assets at Brussels Airport

    As anyone who has ever flown from Brussels Airport or gone to see somebody off knows: the Brussels Airport Company (BAC) site is gigantic. Plus, as a passenger, you are only seeing a fraction of all the areas at the airport. All hands on deck, then, when we were tasked with inventorising the assets at the site.

    View the case Arrow right
    Brussels Airport
    facility

    Market study and tender specifications for caretaking - Brussels Airport

    Airports play an increasingly important role worldwide as economic growth centres for their countries. Brussels Airport Company also wants to pay attention to this and looks forward to expanding its support services to improve this economic ecosystem.

    View the case Arrow right
    Proximus

    Conditiemeting, MJOP en implementatie O-prognose bij ConnectImmo

    View the case Arrow right
    DB Schenker
    facility

    FM output audit DB Schenker

    FM output audit

    View the case Arrow right
    Fmis 1
    business-transformation

    Optimization FMIS tool City and CPAS Lier

    An FMIS system is generally known today in facility centers. Experience shows, however, that not every facility organization uses the tool optimally. This is also the case for City and CPAS Lier. Their Ultimo FMIS tool was insufficiently used. Ultimo therefore advised to approach Freestone in order to refine and optimize facility processes based on the Ultimo FMIS tool.

    View the case Arrow right
    Vilvoorde
    building-sustainability

    Conditiemeting en meerjarenonderhoudsplanning bij Stad Vilvoorde

    View the case Arrow right
    Mol
    real-estate-

    Accommodation study for Municipality and PCSW of Mol buildings

    The administration wished to use an accommodation study to provide the future management team with all the necessary information so that strategic decisions could be taken. These strategic decisions would form the backbone of the new strategic policy plan and the investment plan.

    View the case Arrow right
    Willebroek
    facility

    FMIS support voor gemeente Willebroek

    View the case Arrow right
    Coca Cola
    facility

    Roll-out FMIS bij Coca-Cola

    Coca-Cola European Partners (CCEP) startte in 2015 met het gebruik van een Facility Management Informatie Systeem (FMIS, myMCS). Het hoofddoel is het centraliseren van curatief en preventief onderhoud, alsook het voorzien van een communicatiestroom van meldingen voor alle medewerkers binnen CCEP.

    View the case Arrow right
    Vilvoorde 2
    project-sourcing-en - real-estate-

    Project Manager containerschool De Puzzel at Stad Vilvoorde

    Stad Vilvoorde was op zoek naar een projectbeheerder voor de bouw van een containerschool in De Puzzel Romeinsesteenweg.

    View the case Arrow right
    Freestone logo
    About Freestone Academy Team Partnerships Clients Downloads News Cases Contact

    De Hene 10
    B-1780 Wemmel

    Google Maps Arrow right

    +32 2 453 95 50
    contact@freestone.be

    Contact Arrow right

    Receive our newsletter * Required fields

    This is a required field.

    Provide a valid e-mail address.

    This is a required field.

    Provide a valid e-mail address.

    This is a required field.

    Provide a valid e-mail address.

    Facebook
    LinkedIn
    Advisory
    LinkedIn
    People
    Privacy statement General Terms and Conditions Terms of use Cookie policy
    Crafted by PongPing.