Inventory technical assets, condition measurement and energy quickscan for ZNA
In 2019, Ziekenhuis Netwerk Antwerpen wanted to get an overview of the maintenance costs for 9 of their hospitals in Antwerp for the coming years and chose Freestone's expertise for this extensive assignment.
General Project Info
Customer: Ziekenhuisnetwerk Antwerpen (ZNA)
Assignment: Building and installation studies
Periode: 09/2018 - 01/2019
Surface area: 213.064 m² (gross floor area inspected)
Number of buildings: 8 sites with multiple buildings
Number of assets inventoried and included in multi-year maintenance plan: 18.153
Project
Detailed inventory at local level, which is used as a basis for the condition assessment (per room, for all rooms of the different ZNA sites)
Control of numbering and labelling of the inventory and rooms
Condition measurement of architecture and techniques
Objective condition measurement for all building parts and installations of the different ZNA sites and this according to the most recent version of the NEN2767.
Energy quickscan report including potential energy savings
Reporting, which keeps all data digitally up-to-date, and consists at least of
A condition report, including all insights into the condition, defects, location, priority, etc.
Management reporting including all insights into the costs for the next 20 years
A technical report including all insights into the inventory, the preventive measures
Energy quickscan report including potential energy savings